Work Breakdown Structure (WBS)
Purpose and Assumptions
The purpose of the Main Injector BPM (MIBPM) upgrade WBS is to provide the project management team a tool to coordinate and present project related information in an accessible and useful manner to the individuals involved in the project. Links provided in these pages may be restricted to certain individuals, depending on the sensitivity of the subject. The guidance for the project is documented in the detailed documentation described in the RUNII Main Injector Upgrade Plan. Terms used in these pages are mostly consistent with standard project management terms used in the DOE project management guidance documents.
Assumptions made for project tasks and resource management are designed to be consistent with the over-all MIBPM upgrade project. Initial estimates are based on the recently complete Tevatron BPM upgrade project and past experiences with other BPM projects including Recycler and Beamline BPM projects. Both MIBPM and TEVBPM projects are similar in complexities. It is expected that the MIBPM project will be able to leverage on the experiences gained in the TEVBPM project including software and hardware design and implementation.
Main Injector BPM project uses Microsoft Project for management. The working project file is maintained at the project management office and monthly statusing is provided to the RUNII project manager. Reports from the project file are posted in this web space. The standard notation for MIBPM project file is MIBPMUpgrade.mpp.
Following directories contain various project documentation:
Project information (projectInfo): Financial information about the project is available here.
Change control (changeControl): Once baselined, changes to the project file including change documentation shall be controlled by a change management process. Documents related to approval for change and document describing and justifying chances are available in this directory.
MIBPM Installation / Commissioning(installComm)
Verification and Validation (VnV)
Original planning information for the overall Run II upgrade project can be found in the following documents: