Machine Study Status

 

 

 

 

 

Ring: 12/16 GeV, 0.9/1.2 MW, 711 m

Linac: Front end improvement

Upgrade: Linac energy and a pre-booster, 4 MW

Off line construction (zero down time)

 

Linac: Front end improvement

Upgrade: Linac energy and a pre-booster, 2 MW

Off line construction (zero down time)

 

Linac: ¶ Front end improvement

¶ Energy upgrade (today's two talks)

On line construction (non-zero down time)

 

Linac: ¶ Front end improvement

¶ Energy upgrade

Off line construction (zero down time)

 

Linac: Front end improvement

Pre-Booster: 2-3 GeV, 200 m

Off line construction (zero down time)